Tag Archives: Hounslow

London Councils’ Climate Change Strategy

January 2021: Ahead of a 19 January London Councils’ Executive meeting, a useful briefing paper has been prepared for the committee highlighting work undertaken by the organisation since the November 2019 Joint Statement on Climate Change with those London boroughs who have signed a Climate Emergency declaration . Seven work areas have been identified, with lead local authorities appointed to take these initiatives forward:

  • #1 Retrofit London: Retrofit all domestic and non-domestic buildings to an average level of EPC B. Lead borough: LB Enfield and LB Waltham Forest
  • #2 Low-carbon development: Secure low carbon buildings and infrastructure via borough planning. Lead borough: LB Hackney and LB Tower Hamlets
  • #3 Halve petrol and diesel road journeys: Halve road journeys made by petrol and diesel via combined measures that can restrict polluting journeys and incentivise sustainable and active travel options. Lead borough: RB Kingston
  • #4 Renewable power for London: Secure 100% renewable energy for London’s public sector now and in the future. Lead borough: LB Islington
  • #5 Reduce consumption emissions: Reduce consumption emissions by two thirds, focusing on food, clothing, electronics and aviation. Lead borough: LB Harrow
  • #6 Build the green economy: Develop London’s low carbon sector and green our broader economy. Lead borough: LB Hounslow
  • #7 Creating a resilient and green London. Lead borough: LB Southwark

The paper sets out some a useful Indicative Timetable of Events and Milestones for London Councils over the coming months and up to COP26. Further detailed information on the full extent of the work undertaken to date through the joint declaration is available on the London Councils Climate Change page.

Posted in News | Tagged , , , , , , , , , | Comments Off on London Councils’ Climate Change Strategy

London: Achieving Net Zero

April 2020: Think tank Future of London recently hosted a useful online seminar for their ‘Achieving Net Zero‘ project, involving public sector and built environment professionals looking at the challenges faced in decarbonising London’s building stock.

The session included speakers from the London boroughs of Camden, Lambeth and Hounslow providing updates on their climate emergency plans – as well as contributions from LandSec, Arup and Montagu Evans amongst others. The agenda for the meeting is available to download here – and the webinar has been posted in full online and can be seen here.

Posted in News | Tagged , , , | Comments Off on London: Achieving Net Zero

London’s Electricity Infrastructure

July 2013: A recent meeting of the London Infrastructure Group, part of the London Enterprise Panel (the local enterprise partnership for London) included a paper considering requirements for London’s growing electricity infrastructure.

The paper highlights that “UK Power Networks (UKPN) is London’s main Distribution Network Operator (DNO) for electricity serving all except the London boroughs of Hillingdon, Hounslow and Ealing. Scottish and Southern Energy serve these boroughs. As DNO UKPN’s responsibility extends from the Grid Supply Points where it takes electricity at high voltages from National Grid to the supply of London’s homes and businesses.”

UKPN is currently consulting on its 2015 – 2023 Business Plan which is to be submitted to Ofgem.  Much of the detail around UKPN’s proposals in the Plan have been discussed in recent meetings of the Mayor’s High Level Electricity Working Group and an appendix paper to the London Infrastructure Group meeting considers some key elements of the Plan.

The papers report that the Mayor has raised concerns regarding future investment in London’s electricity distribution infrastructure and that UKPN latest proposals “represent a step backwards regarding the prospects of UKPN investing in advance of need. It gives rise to concern about whether UKPN has taken sufficiently full account of the needs of the City of London and other central London boroughs facing business and development growth. The reason for the backward step is mainly attributable to the intervention of Ofgem” (some of these concerns on future needs were recently raised by businesses in the recent West End Commission report).

Investment in major substations has been reduced from £170 million to £100 million compared to the original draft. UKPN now includes only four of the planned six (plus Earls Court1) major substations for central London on a funded basis (see Table 1 below for details). The origin of the change is principally Ofgem’s unwillingness to accept the remaining three substations as part of UKPN’s regulated asset base, since they would amount to investment by UKPN in advance of an actual connection being requested.

Interesting to note that other changes have been made to UKPN’s forecasts of sustainable energy investment in response to comments to the original consultation. These include changes to the assumptions regarding the uptake of electric vehicles and to the infrastructure investment for Feed–in–Tariff eligible generation.

Posted in News | Tagged , , , , , , | Leave a comment

£11m awarded to London energy programmes

January 2013: Responding to a competition launched last October, DECC have just announced that 132 projects have won a share of £46 million of funding. The three strands of the funds were  “to help reduce fuel poverty, boost energy efficiency, and encourage collective switching and purchasing in regions across Great Britain.” The full press release is here and boroughs successful (and amounts awarded) can be downloaded here, and shows London did well with a total of £11m worth of projects selected. These were:

Fuel Poverty

  • Barnet (£107,500)
  • Waltham Forest (£97,000)
  • Tower Hamlets (£2,254,000)
  • Camden (£407,500)
  • Brent (£102,000)
  • Hillingdon (£106,500)
  • Hounslow (£706,000)
  • GLA together with 18 London boroughs (£5,360,421)

Green Deal Pioneer Places

  • Brent (£153,000)
  • Camden (£120,180)
  • Hounslow (£262,000)
  • Haringey (£275,200)
  • GLA together with 18 London boroughts (£266,921)

Cheaper Energy Together Funding

  • Tower Hamlets (£37,351)
  • Kingston upon Thames with 16 London boroughs (£686,655)

Little information is available at the moment on what exactly these various schemes will do in their respective areas, however, some  guidance released when the competition was launched provides details of what this funding is supposed to be delivering.

London Councils reports that the last of the collective energy purchasing schemes, where Kingston Council is the lead borough, will help “Vulnerable residents in up to 1.75 million homes across London will be offered assistance by their local council to get a better energy deal and save money.” DECC’s Secretary of State, Ed Davey, is hugely supportive of such collective purchasing deals (see here and here), and promoted such programmes in his former role at the Department of Business (BIS). He’s also the MP for Kingston and Surbiton, so it’s not surprising that his local council undertook a strong role in this competition.

Posted in News | Tagged , , , , , , , , , | Leave a comment

Sky Studios wind turbine spins into action

29 May 2012:  Sky have announced that they have installed a wind turbine  at its West London campus. “The 55-metre Northwind 100 turbine is expected to provide over 133 MWh/year of clean energy to Sky Studios – enough to meet its annual office lighting requirements. The new wind turbine will operate in conjunction with Sky’s recently-commissioned [biomass] Combined Cooling, Heating and Power (CCHP) plant.” Read the full news release here.

Posted in News | Tagged , , , | Leave a comment

Hounslow Warm Homes Healthy People Conference

March 2012: The Hounslow Warm Homes, Healthy People conference will look to:

  • Find out about the causes and effects of cold homes and poor quality housing. Health issues related to cold homes cost the NHS in London £118m each year, and nearly £900m nationwide.
  • Learn more about services available across the Borough to help and support residents to stay warm and well at home
  • Share views and ideas on how services in Hounslow should best be coordinated to ensure the best outcomes for residents

Hounslow Council is particularly keen to consult with stakeholders at this early stage as it develops its thinking about how the Council, the health sector, voluntary organisations and community groups can best work together to help people keep warm and healthy at home.

The event will take place on Friday 23rd March, from 9.30am – 3.30pm, at Hounslow Civic Centre. Register now for your free place here.

Posted in Events, News | Tagged , , | Leave a comment

RE:NEW to roll out across nine more London boroughs

27 September 2011: The Mayor has announced today that homes in specific areas in Wandsworth, Croydon, Brent, Ealing, Harrow, Hillingdon, Redbridge, Tower Hamlets and Hounslow are the next to benefit from the RE:NEW energy efficiency programme.  To find out if you are in an area which is getting the RE:NEW treatment go to the postcode search facility here.

Posted in News | Tagged , , , , , , , , , , | Leave a comment

Hounslow Climate Change Strategy

September 2011: Hounslow is currently in the process of developing the borough’s first climate change strategy. Consultation on the proposed objectives for the Strategy will take place over a six week period from Monday 5 September to Sunday 15 October 2011.

Posted in News | Tagged | Leave a comment

London schemes through to the next round of ‘energyshare’

12 August 2011: British Gas and River Cottage’s energyshare initiative have today announced the ‘longlist’ of 100 community renewable energy projects bidding for support from the initial £500,000 energyshare fund. Only seven London schemes are in this list of 100 projects and links to their project descriptions can be found below:

Ham Hydro – the installation of hydro power turbines on the River Thames at Teddington Weir
PETRA – green refurbishment of tower blocks to best practice standards of energy and water efficiency and generate renewable energy
SPACE_Solar – the installation of a large solar array on a new artist studio building in Peckham
All Souls Solar – installation of a solar array on All Souls Church in St Margarets, Isleworth
Glyndon Community – a scheme to make part of Plumstead-based Glyndon community centre’s energy consumpution come from renewable sources
Hackney City Farm
Hyde Farm Climate Action Network – Supporting ongoing energy saving projects on the Hyde Farm estate in Balham.

Further funding of £2m will be supplied for future bidding rounds by British Gas – much more information on energyshare can be found on their website.

Posted in News | Tagged , , , , , , , | Leave a comment

London’s Power Stations

30 June 2011: DECC’s annual Digest of UK Energy Statistics (DUKES) has just been published providing a welcome summer reading challenge for all energy-geeks… DUKES is principally concerned with national level energy statistics, and hence does not provide regional breakdowns in most instances (those are usually set out in separate articles in DECC’s quarterly journal Energy Trends). However, there a few issues areas worth looking at. In the first instance, it’s useful to be aware of what power plants operate within London itself, which in total contribute only a small percentage of London’s total electricity demand. The following London schemes are listed in the ‘Power Stations in the UK’ table in Chapter 5 of DUKES, to which some additional information/links have been added to below:

  • Barking Power – a gas fired Combined Cycle Gas Turbine (CCGT) of 1000 MW (megawatts) generation capacity, which first started operating in 1994
  • Citigen (London) UK Ltd  – based in Charterhouse Street in Smithfields and owned and operated by E.ON, this scheme is fuelled by  gas and gas oil, and is rated 31 MW and first started operating in 1995. The unit operates in Combined Heat and Power (CHP) mode providing heating, and also cooling (via chilled water) distributed by a district energy network to a number of customers in the City area.
  • Thames Valley Power – a joint venture between EDF Energy and ATCO Power, this  Gas/Gas oil 15MW CHP has been operating since 1995 at Heathrow Airport.
  • London Heat & Power Company –  a 9MW gas CHP based at Imperial College which started operation in 2009.
  • Barkantine Heat & Power Company – A 1MW gas fuelled CHP with district heating system based on the Barkantine Estate in Tower Hamlets
  • Taylors Lane – Taylor’s Lane Open Cycle Gas Turbine (OCGT) station, situated in Willesden is operated by E.ON and has two gas turbine units fired on natural gas with a total capacity of 132MW and began generating in 1979.
  • Enfield Power Station– E.ON owned and operated 400MW gas turbine scheme which began generating in 1999.
  • SELCHP – South East London Combined Heat & Power Ltd (SELCHP) 32 MW waste fired operated by Veolia Environmental Services began generating in 1994 – but only in power-only mode. Heat offtake opportunities (so the plant can finally operate in true-CHP mode) are currently being explored with Southwark Council.
Posted in News | Tagged , , , , , , , , | Leave a comment

Sky cuts ribbon on Europe’s greenest studios

4 Jul 2011: Business Green article providing details on Sky’s new broadcasting studios in Osterley, West London, which include on site a wind turbine, natural air cooling systems and also a “a biomass-fuelled combined cooling, heat and power (CCHP) plant which will supply at least 20 per cent of the energy needed for the building’s electricity and heating systems.”

Posted in Decentralised Energy, News, Renewable Energy | Tagged , , | Leave a comment

Hounslow

Hounslow first draft climate change strategy – September 2011

Posted in London Boroughs | Tagged | Leave a comment